General Petroleum Company (GPC): (Offshore) Amer (2) platform
Project: Repairing of Broken 6" Pipeline at Depth=25m
- Seabed survey by divers for riser, riser clamps to locate breaking point on pipeline and free span points all supported by video recording.
- Carry out cold cutting works for the old riser and around the breaking point.
- Carry out Diving works for Inspecting pipe thickness by (UT) before installation of the mechanical connector.
- Supplying Mechanical Connector & Swivel flange and carry out diving works for installation of mechanical connector & Swivel flange on the pipeline.
- Fabrication and carry out diving works for installation and fastening of new riser, clamps and spools.
- Leak Test by pressurizing the line with
- Corrosion inhibitor +Oxygen Scavenger+Biocide
- Free span correction for pipeline.